Lifting & Rigging Checklist
Pre-lift checks for oilfield lifts: plan, crane/rigging gear, exclusion zone, and lift authorisation.
HSE officers and permit controllers use this check across wellsites, process plant, hot work, confined space and isolations. It walks through Planning and Gear & execution.
Site teams in Ghana, Nigeria and similar markets use it when the inspection is still a clipboard, a WhatsApp photo or an Excel sheet rebuilt after the shift.
This PDF is a sample for inspections done by hand. AuditDAT does not work with paper checklists. We digitise the form. Your team then does the check on a phone or tablet, even with no signal. Photos, notes and a signature stay on the inspection. A fail becomes a job card before you leave site. Learn more
The rest of this checklist is locked. Enter your work email to download the PDF.
On the form
What this inspection covers
Lift plan, gear checks, exclusion zone, and go/no-go.
- 01
Planning
- 02
Gear & execution
When a line fails
Each line is marked pass, fail, or not applicable. In AuditDAT, a fail becomes a job card with an owner and a due date before you leave the site.
FAQ
What does this Lifting & rigging check cover?
What does this Lifting & rigging check cover?
It covers Planning and Gear & execution. HSE officers and permit controllers use it across wellsites, process plant, hot work, confined space and isolations. The PDF is a sample for teams still inspecting by hand. AuditDAT does not use paper checklists. The check runs on a phone, and a fail becomes a job card.
Does AuditDAT use this Lifting & rigging checklist on paper?
No. The PDF is a sample for teams still doing inspections by hand. AuditDAT does not work with paper checklists. We digitise the form. Your team then inspects on a phone, tablet or the web, even with no internet. A fail becomes a job card with an owner and a due date.
More oil & gas samples